Project Phases

Phase 3

FOUNDATIONS AND STRUCTURAL STEEL

 

LEGEND

  •  Hospital Site Fence
  •  MOB Site Fence
  •  Pedestrian Covered Walkway
  •  Construction Access Gate
  •  Bus Stop Shelter
  •  Pedestrian Redirection Sign
  •  Pedestrian Travel
  •  Tunnel Construction

General Notes

  • The locations of access gates, site furnishings, signs, etc. are approximate
  • *Dates for MOB work are tentative
  • Temporary nighttime sidewalk closures as tunnel construction requires. Pedestrians will be directed to the opposite side of the street.