Project PhasesPhase 1INTERIOR DEMOLITION LEGEND Hospital Site Fence Construction Access Gate Bus Stop Shelter General Notes The locations of access gates, site furnishings, signs, etc. are approximate Phase 2DEMOLITION, EXCAVATION AND SHORING LEGEND Hospital Site Fence Pedestrian Covered Walkway Construction Access Gate Bus Stop Shelter Pedestrian Redirection Sign Pedestrian Travel Tunnel Construction General Notes The locations of access gates, site furnishings, signs, etc are approximate Temporary nighttime sidewalk closures as tunnel construction requires. Pedestrians will be directed to the opposite side of the street. Phase 3FOUNDATIONS AND STRUCTURAL STEEL LEGEND Hospital Site Fence MOB Site Fence Pedestrian Covered Walkway Construction Access Gate Bus Stop Shelter Pedestrian Redirection Sign Pedestrian Travel Tunnel Construction General Notes The locations of access gates, site furnishings, signs, etc. are approximate *Dates for MOB work are tentative Temporary nighttime sidewalk closures as tunnel construction requires. Pedestrians will be directed to the opposite side of the street. Phase 4HOSPITAL CONSTRUCTION LEGEND Hospital Site Fence MOB Site Fence Pedestrian Covered Walkway Construction Access Gate Bus Stop Shelter Pedestrian Redirection Sign Pedestrian Travel General Notes The locations of access gates, site furnishings, signs, etc. are approximate *Dates for MOB work are tentative Phase 5BUILDOUT LEGEND Hospital Site Fence MOB Site Fence Pedestrian Covered Walkway Construction Access Gate Bus Stop Shelter Pedestrian Redirection Sign Pedestrian Travel General Notes The locations of access gates, site furnishing, signs, etc. are approximate *Dates for MOB work are tentative Phase 6FINISHES LEGEND Hospital Site Fence MOB Site Fence Pedestrian Covered Walkway Construction Access Gate Bus Stop Shelter Pedestrian Redirection Sign Pedestrian Travel General Notes The locations of access gates, site furnishings, signs, etc. are approximate *Dates for MOB work are tentative Phase 7FINISHES LEGEND Hospital Site Fence MOB Site Fence Pedestrian Covered Walkway Construction Access Gate Bus Stop Shelter Pedestrian Redirection Sign Pedestrian Travel General Notes The locations of access gates, site furnishings, signs, etc. are approximate *Dates for MOB work are tentative